Wednesday, March 4, 2009

Front Link

Started by lining up the front axle to within a 1/16th and cutting and tacking together the front lower links. They were exactly the same length as what I drew in Autocad, I guess they should be but it's nice when the real thing matches the print.



Then I moved the front axle to the de-bracketing area... ok it's just the garage next to the Rover. That's my next and last dirty job, well besides rebuilding the engine, trans, tranfer and axles..



Just a shot of the rig with the axle out.



Should have the flanges for the cage today so I can split the tubes at the floor. This will allow my to more permanently weld the lower cage sections to the frame and still be able to remove the tub and bulkhead.


34 Days...

No comments:

Post a Comment